Yella on the Water 25 Western Ave / Stacy Boulevard opening soon

The exterior transformation by RePro General Constuction & Design Services (ReProservice.com) for Danielle and Carlo Berdahn’s new Mediterranean bistro, Yella on the Water, is moving right along (in the former Morning Glory space) on Stacy Boulevard.

 Before (2013)  vs. construction underway (May 2019)

Sept 9 2013 Morning Glory ©c ryan
2013

Yella on the water new exterior Gloucester Mass_20190512_© c ryan (2)

 

They opened Yella Grille in Andover  (and catering) ten years ago.

DPW making public works work: great marsh walk along Thatcher Road from Good Harbor Beach entrance to footbridge Gloucester Massachusetts

View to Good Harbor Beach across marsh_from the future sidewalk_Gloucester Mass_2018 June 30_©catherine ryan
back of Good Harbor Beach, framed and open views across marsh from Thatcher Road, June 2018  

Walk this way! Part 1- Pilings In, Guardrails Gone!

A new mini marsh promenade is underway along Thatcher Road from Gloucester’s Good Harbor Beach entrance all the way around to the foot bridge. Walkers will have safe access via sidewalks and a natural path.

Gloucester has been planning for an opportunity to extend safer pedestrian access along Thatcher Road for years. When National Grid scheduled replacing antiquated gas lines along the busiest and scenic stretch, Gloucester Public Works was ready to seize the opportunity with collaborative solutions sensitive to conservation. Sidewalk upgrades were built out at both ends and paused until National Grid completed its underground infrastructure work. Prior to paving, Thatcher Road will be widened slightly to accommodate a safe and scenic path. The city hoped to complete repairs and paving by autumn and is on track to meet that goal. This week crews were clearing brush. The rusty guardrail was removed and will be replaced with a new design. “It will all happen quickly now,” says Mike Hale, director of Public Works.

 

Before marsh walk _Thatcher Road_Gloucester Mass_2018 June 19_future DPW work by great marsh ©catherine Ryan
BEFORE June 2018 ©catherine ryan

Rusty rail outta here_Thatcher Road slightly widened_pedestrian safe and access_great marsh back of Good Harbor_Gloucester Mass_2018 Sept 11 ©catherine Ryan

Thatcher Road Under Construction

There’s an ideal and creative scenic overlook solution over the river that’s under construction off site. I can’t wait for the reveal! I have been documenting progress and will post various updates, fast stats and history as another impressive project moves along.

New pedestrian walkway_Thatcher Road_Public Works_Gloucester MA_ 2018 Sept 11_©catherine ryan (1)

New pedestrian walkway_Thatcher Road_Public Works_Gloucester MA_ 2018 Sept 11_©catherine ryan (3)

Gloucester’s great marsh walk will afford safer access for sweeping seasonal observation

winter, spring, summer, fall 

 

One of my favorite Gloucester motifs, Gloucester oxbow, view from Thatcher Road 

Gloucester motifs_Gloucester oxbow_at the back of Good Harbor Beach_view from Thatcher Road_2017 Februray 5©c ryan.jpg

Stacy Boulevard construction Part 5: rounded a big corner and an angle of repose

 

IMG_20161202_101325

 

INVISIBLE DETAILS UNDERFOOT AND RIGHT THERE

Earlier posts outline the engineering. The photograph above details the subgrade that was re-established for irrigation (note ditch alongside walkway), loam and sod. The photo also emphasizes the lengthy short wall on the right which was removed for access during construction. “The excavation was deep enough that the angle of repose was into the old wall.” The wall in the photo is rebuilt.

 

00001IMG_00001_BURST20161202101306_COVER

 

MEMORIAL BENCHES

Spacing and symmetry were important design considerations for Stacy Boulevard construction. The old benches were surveyed. Most were returned relative to where they were sited before the build out. The memorial benches on the boulevard are full. This one shows a tribute to Al Swelka.

 

IMG_20161202_094543

 

IMG_20161228_110253

00000IMG_00000_BURST20161202094911_COVER

Photos Nov-Dec 2016. Video caption: Stacy Boulevard construction minute – stroll before January, and sod.  Upcoming posts in this Stacy Boulevard series include: disasters, the cultural landscape, and Blynman. 

Series:

Part 4 – Gloucester’s majestic public works construction stats: bringing the Stacy Boulevard plans to life 

Part 3- Gloucester’s Stacy boulevard public works construction Part 3: compare high res plans from 1922 and 1923 with today

Part 2: Stacy Boulevard Public Works stunner | Gloucester is an early client for the Harvard and Olmsted trained landscape designer, Thomas Warren Sears. His 1908 photos are a must see!

STACY BOULEVARD NEARING THE FINISH LINE Part 1 – 

September 12 2016- Stacy Boulevard construction update: historic Blynman the Cut Bridge project scope plans and engineering details

August 2016 

This Guy!!

 

Meet my hero!  I love this guy!  If you need some work done on your house you’d be crazy to not call Matt Gardner.  Last year I saw a small platform deck on the sweetest little house in Nantucket and I took one distant photo from the end of the home owners’ long driveway.

With that photo and lots of babbling about what I love….and I what I really don’t like, Matt Gardner saw my vision (even when I wasn’t completely sure I could see it) and created what I consider a true work of art!  I am so smitten with our new deck I can’t even stand it!  Not only is he completely skilled, but he was patient, honest and reliable…which made working with him really wonderful.

IMG_4093

IMG_4178 IMG_4176 IMG_4100